TACOMA, WA · DUPLEX CONVERSION
Tacoma duplex rewiring.
Three meters. A fresh start.
A complete electrical rebuild for a fire-damaged house converted into a duplex with storage—new wiring, three 125A metered services, three panels and an underground Tacoma Power connection.
Back to all projectsTHE PROJECT · 2903 N 20TH ST, TACOMA, WA 98406
Duplex electrical wiring and meter installation in Tacoma
This old Tacoma house had been damaged by fire and was rebuilt as a duplex with storage. Shudko Electric handled the electrical scope from the beginning: permitting, complete wiring, trim-out and the new service equipment.
We installed a three-pack meter assembly with 125A for each metered service and three electrical panels. We also installed the underground conduit system for the Tacoma Power connection, submitted the new-service application and handled the utility requirements through connection.
- Electrical permitting for the duplex conversion and storage
- Complete electrical wiring and trim-out
- Three-pack meter installation with three 125A metered services
- Installation of three electrical panels
- Underground conduit installation for the new electrical service
- New-service application submitted to Tacoma Power
- Tacoma Power requirements and coordination through utility connection
From fire damage to duplex conversion




Permits and utility planning
The inspection notice documents rough-in approval for the west unit. The marked utility sheets show the requirements used to plan this project’s underground service.



Underground electrical service for Tacoma Power



Completed meter equipment and panel
THE FINISHED DUPLEX
A new chapter for this Tacoma home
TACOMA DUPLEX ELECTRICAL WORK
Rewiring, metering and new-service coordination
This North 20th Street project brings together complete house rewiring, duplex conversion electrical work, a three-pack meter installation and underground service preparation. Shudko Electric handled the electrical work from permits and rough-in through trim-out and utility connection.
What electrical work was included in the duplex conversion?
We completed the wiring and trim-out for the duplex with storage, installed three electrical panels and provided a three-pack meter assembly with 125A for each metered service.
Who handled the Tacoma Power new-service application?
Shudko Electric submitted the new-service application and coordinated Tacoma Power’s requirements through connection, including installation of the underground conduit system.
What does the inspection photo show?
The inspection notice in the gallery shows electrical rough-in approval for the west duplex unit. The gallery also includes underground service installation photos, marked utility planning sheets and the completed meter equipment.
Explore our electrical panel, meter and service upgrades or browse more completed electrical projects.
TACOMA ELECTRICAL PROJECTS
Planning a rebuild or duplex conversion?
Tell us about your property, wiring needs and electrical service plans.




