253-455-5907

KING COUNTY & PIERCE COUNTY

Electrical Panel
& Meter Upgrades.

Replace an aging panel. Upgrade your meter. Plan a 100A to 200A service upgrade.
One team handling permits, utility coordination and inspection.

Tell us about your home. We’ll review the equipment and provide a written, project-specific estimate.

A REAL BELLEVUE UPGRADE

100A to 200A.
From old to upgraded.

Relocated meter, new Eaton 40-space panel, permits and PSE coordination.

Existing Bellevue breaker panel before replacement
Before
New Eaton 40-space panel after the Bellevue service upgrade
After
See the Bellevue upgrade

★★★★★

“Had Shudko Electric handle a full 200A panel upgrade at my home in Bellevue, and the experience was excellent from start to finish.”

Himanshu Batra · Google review excerpt

Read the full review

YOUR UPGRADE

The right scope for your home.

Panel replacement

New breaker panel, circuit reconnection and labeling, with grounding and bonding reviewed for your installation.

Meter upgrade

Updated meter equipment and utility coordination based on your service requirements.

100A to 200A service

A coordinated service upgrade with equipment, permits, planned disconnect and reconnect, and inspection.

A panel replacement alone does not increase service amperage. Utility requirements and your home’s load calculation determine the upgrade scope.

START WITH A FREE ESTIMATE

Let’s plan your upgrade.

Serving King and Pierce counties. Request your estimate through our Jobber form, or call to discuss your project.

Submitting a request does not book an appointment.